2 Jul 2016

JOBS FOR FRESH ENGINEERS AT PORT QASIM COAL FIRED POWER PLANT

CAREER OPPORTUNITIES FOR FRESH GRADUATE ENGINEERS

Port Qasim Power Plant is a Coal Fired Power Plant with a capacity of 1320MW (2*660MW).It is being Developed by Power China and AMC. It will be completed by December,2017.
We need following position to be filled very urgently by fresh graduates of 2016,2015 and 2014 as Graduate Trainee Engineers.


Last Date to Apply: 10 July,2016

Trainees Required From the Following Sectors:
  • Electrical Engineering
  • Mechanical Engineering
  • Electronics Engineering
  • Chemical Engineering
  • Industrial Chemistry
  • Environmental Engineering
  • Mechatronics and Control Engineering
  • Computer System Engineering
Mail your CV at   powerchinaqasim@gmail.com

Advertisement:


Like our facebook JOB PAGE  JOBSEEKERZ.PK